images/roadwork_sign_web_1.jpg

 

The Arizona Department of Transportation advises motorists on Interstate 40 to plan ahead and be prepared to merge into open travel lanes near Seligman at the Interstate 40B overpass bridge (Exit 121) while new bridge deck construction is underway.

The work will require the following restrictions:

Intermittent lane closures of east- and westbound I-40 are scheduled from 7 a.m. to 8 p.m. Wednesday, Jan. 8, and Thursday, Jan. 9. Detours: Traffic will be diverted to the Exit 121 on- and off-ramps for both east- and westbound traffic. The speed limit will be reduced to 25 mph through the work zone.      

East- and westbound I- 40 will be reduced to one lane between mileposts 120 and 122 (right lane closed) beginning Thursday, Jan. 10 and continuing through spring 2019. The speed limit will be reduced to 55 mph through the work zone.

A 14-foot vehicle-width restriction will also be in place.

Drivers should proceed through the work zone with caution, slow down and watch for construction personnel and equipment.

For more information about the project, please visit http://www.azdot.gov/I40bWSeligmanBridges">azdot.gov/I40bWSeligmanBridges.

0
0
0
s2sdefault
Save More Auto Ad