images/travel_restrictions_web.jpg

 

The Arizona Department of Transportation advises motorists to plan ahead and expect nighttime travel delays of up to 30 minutes for bridge deck construction north of Wickenburg

at Big Jim Wash Bridge (milepost 165.5). The work will require the following restrictions from 7 p.m. to 7 a.m. beginning Sunday, Oct. 14, and continuing through November.

US 93 north of Wickenburg will be reduced to one lane in both directions through the work zone, Sundays through Thursdays.

Flaggers and law enforcement will be assisting with traffic control.

A 12-foot vehicle-width restriction will also be in place.

Construction will include the repair of the deck joints, milling and replacement of the bridge deck, as well as building a scour protection system beneath the bridge.

For more information about the project, please visit http://www.azdot.gov/US93BigJimBridge">www.azdot.gov/US93BigJimBridge.

0
0
0
s2sdefault
Save More Auto Ad